Tag: Repair

Reblocking, repair of portions of some NCR roads ongoing until April 3: MMDA

(Eagle News)–The Department of Public Works and Highways is performing reblocking and repairs of portions of the following roads until April 3, the Metropolitan Manila Development Authority said. – C5 Road SB between Lanuza Avenue and Green Valley Footbridge, Barangay Ugong, Pasig (truck lane) – C5 Road after elevated U-turn slot (3rd lane from island), Pasig -Edsa southbound near Estrella Street and near Ayala Avenue, Makati – Edsa northbound near MRT Buendia station, Makati (innermost […]

Several roads in M. Manila scheduled for repair

(Eagle News)–Several roads in Metro Manila are scheduled for repair over the weekend, the Department of Public Works and Highways said. The DPWH advised motorists to look for alternate routes, with the work on the following roads scheduled until Monday, March 16, 5 a.m.: A. Bonifacio Ave.- Sgt. Rivera St. to Bansalangin St., first lane from sidewalk (southbound) Elliptical Road-from Kalayaan Ave. to Maharlika St., 3rd lane from inner sidewalk (westbound) General Luis St. (westbound) […]

Several M. Manila roads scheduled to undergo repairs, reblocking

(Eagle News)–Several roads are scheduled to undergo reblocking and repairs during the weekend. The Department of Public Works and Highways said the reblocking and repairs of the following roads started at 11 p.m. on Friday, Jan. 31: SOUTHBOUND: 1. A. Bonifacio Ave. (SB) 7th Avenue to Sgt. Rivera St. (2nd lane from sidewalk) 2. EDSA Bulacan St. to West Ave. (1st lane from sidewalk) 3. EDSA approach BP Tuazon flyover to approach A. Boni Serrano […]

Some M. Manila roads to undergo reblocking, repair starting tonight

(Eagle News) –Expect heavy traffic in some roads in Metro Manila over the weekend. The Department of Public Works and Highways said the following roads will undergo rehabilitation work starting 11 p.m. on Friday, November 22: EDSA Portion of P. Tuazon Flyover approaching Boni Serrano Flyover, 2nd innermost lane, 2nd lane beside railway northbound lane after Aurora Boulevard up to New York Street, 3rd lane from sidewalk Quezon City southbound direction of A. Bonifacio Avenue […]

Some roads scheduled for reblocking, repair starting Saturday, Oct. 26

(Eagle News)–Several roads are scheduled to undergo repair and reblocking starting Saturday, Oct. 26. The Metropolitan Manila Development Authority said work on the following roads will begin at midnight: SOUTHBOUND: 1. EDSA National Shrine to West Ave. (1st lane from sidewalk) 2. Mindanao Ave. fronting Caltex Gas and after Tandang Sora Ave. (2nd lane from sidewalk) 3. EDSA before Estrella (outer lane) 4. EDSA Camp Crame Gate to after Annapolis St. (beside MRT) 5. G. […]

Several Metro Manila roads scheduled for reblocking, repair

(Eagle News)–Several Metro Manila roads are scheduled to undergo road reblocking and repair, the Department of Public Works and Highways said. The DPWH said the following are undergoing repair and reblocking since Friday, Sept. 13, at 11 p.m.: EDSA southbound from Bansalangin to North Avenue (U-turn slot), 5th lane from sidewalk southbound from Magallanes-Baclaran bus stop to Magallanes-Alabang bus stop, outer lane northbound from Main Avenue to P. Tuazon tunnel, 1st lane from sidewalk C-5 […]

Some M. Manila roads scheduled for reblocking, repair until Monday, Sept. 9

(Eagle News)–Several Metro Manila roads are scheduled to undergo reblocking and repair starting Friday, Sept. 6. The Department of Public Works and Highways said the repair of the following roads will end on Monday, Sept. 9, at 5 a.m. EDSA southbound from Bansalangin Street to North Avenue (U-turn slot), 5th lane from sidewalk southbound from Eugenio Lopez Drive to Timog MRT station southbound from Lagarian Creek to Arayat Street, Cubao southbound from Magallanes-Baclaran bus stop […]

Several roads scheduled to undergo repair, reblocking until Tuesday, Aug. 27

(Eagle News)–Several roads in Metro Manila are scheduled to undergo road reblocking and repair from Friday, Aug. 23. The Department of Public Works and Highways said the following roads will undergo the work starting 11 p.m. to 5 a.m. on Tuesday, Aug. 27. Edsa southbound from Magallanes-Baclaran bus stop to Magallanes-Alabang bus stop, outer lane southbound from Eugenio Lopez Drive to Scout Borromeo (desilting and construction of manhole) northbound from Main Avenue to P. Tuazon, […]

Several M. Manila roads to undergo reblocking, repair starting Friday, Aug. 16

(Eagle News)–Several roads will undergo reblocking and repair starting Friday, Aug. 16. The Department of Public Works and Highways said the following roads will undergo the work  starting 11 p.m. Edsa southbound Fronting Sojen and Chevrolet, fifth lane from sidewalk Magallanes-Baclaran bus stop to Magallanes – Alabang bus stop, outer lane Eugenio Lopez Drive to Scout Borromeo northbound Before New York St, 1st lane from sidewalk Katipunan Ave.  southbound Boni Serrano tunnel, truck lane Quirino […]

MMDA: Several roads to undergo repair, reblocking until Tuesday, Aug. 13

(Eagle News)–Several roads are scheduled to undergo repair and reblocking starting Friday, Aug. 9, until Tuesday, Aug. 13. The Metropolitan Manila Development Authority advised motorists to avoid the following roads, where there will be construction work: Southbound     EDSA fronting Sojen and fronting Chevrolet (5th lane from sidewalk)     EDSA from Magallanes – Baclaran bus stop to Magallanes – Alabang bus stop (outer lane)     EDSA Eugenio Lopez – Sct. Borromeo (desilting and construction of […]

Some M. Manila roads slated to undergo repair, reblocking

(Eagle News)–Some roads in Metro Manila have been scheduled to undergo road reblocking and repair. The Department of Public Works and Highways said the maintenance work was scheduled from Friday, May 31, at 11 p.m., to Monday, June 3, at 5 a.m. Below are the road portions that are slated to undergo the repair: EDSA southbound from Monte de Piedad to Aurora Boulevard Service Road, 3rd lane from sidewalk southbound at corner of New York […]

Portions of Edsa, C5 scheduled to undergo reblocking, repair

(Eagle News)– Parts of Edsa and C5 are scheduled to undergo reblocking and repair. The Department of Public Works and Highways said the maintenance work is slated to take place from Friday, May 24, to Monday, May 27. EDSA – southbound from Lagarian Creek to New York Street beside sidewalk (intermittent section) – southbound before Monte de Piedad to near EDSA Boulevard Tunnel, 4th lane from sidewalk (intermittent section) – northbound 50 meters after Magallanes […]